Monthly Archive: May 2014

The Brains Of The House! 0

The Brains Of The House!

Well the downstairs kit is now in place and running, we have the following kit on the ground floor: 1 x 24 Volt PSU 1 x 12 Volt PSU 1 x Mini-server 1 x...

The Light At The End Of The Tunnel 0

The Light At The End Of The Tunnel

Its been a long couple of weeks, but the loxone kit is now fully up and running in the house. There’s a lot of tidying up to do in the cabinet but here’s how...

To Late To Cancel Now!! 0

To Late To Cancel Now!!

There’s no going back now, the ceilings are almost all down, Al is doing a great job. One of the tidiest workers i’ve ever met.

Thanks Mr UPS Man 0

Thanks Mr UPS Man

The kit has been delivered: Final kit list: 1 x Mini server 2 x Dimmer Extension 1 x Extension 1 x Air Module 2 x AIR DMX Module 1 x Infra-red Extension 4 x...

Here we go! 0

Here we go!

The lounge and kitchen have been cleared in preparation for the ceilings to come down, apparently its easier for the electricians, i still remain to be convinced on that one.

A first home automation project. 0

A first home automation project.

Back in January 2014 we decided that the time was right to look at modernising our house electrics, and automating what parts of it that we could. Today is the first day of the install.